Installing and calibrating a reson multibeam system on a barge on the Hudson.
About this blog
I was contracted to go to Jersey and work with Weeks Marine. They were installing a reson system on a mobile cart that is going to slide up and down an I beam on the side of a barge. It got off to a slow start but it turned out great in the end.
Trip Start
May 07, 2006
1
Trip End
May 12, 2006

