Installing and calibrating a reson multibeam system on a barge on the Hudson.

Blog thumbnail

About this blog

I was contracted to go to Jersey and work with Weeks Marine. They were installing a reson system on a mobile cart that is going to slide up and down an I beam on the side of a barge. It got off to a slow start but it turned out great in the end.

  • The cart and pole
Trip Start May 07, 2006
1
Trip End May 12, 2006


Loading Map
Map your own trip!
Map Options
Show trip route
Hide lines
shadow

There are 1 entries in this blog

Start your own travel blog

Use this image in your site

Copy and paste this html: